For additional information on the Gunnison Project please refer to the press release dated November 14, 2024 and the Technical Report entitled “Gunnison Copper Project NI 43-101 Technical Report Open Pit Preliminary Economic Assessment”, with the effective date of November 1st, 2024 (the “Report”), each that has been or will be filed on sedarplus.ca.

The Report will be filed on SEDAR+ and on GCC’s website within 45 days of the date of this news release. The Report will consist of a summary of the PEA. The Report is being prepared under the supervision of John Woodson, PE, SME-RM, of M3 Engineering & Technology Corporation, Tucson, Arizona, who is a Qualified Person that is independent of the Company. The Report will also receive contributions from the following additional Qualified Persons, who are also independent of the Company:

  • Mr. John Woodson, of M3 Engineering & Technology Corporation, Tucson, Arizona ((capital and operating costs, and economic analysis).
  • Mr. Jeffrey Bickel of RESPEC of Reno, Nevada (geology and mineral resource).
  • Mr. Jacob Richey, of IMC of Tucson, Arizona (mining methods).
  • Mr. Tom Ryan, of CNI of Tucson, Arizona (pit slope angles)
  • Dr. Terence P. McNulty of T.P. McNulty & Associates of Tucson, Arizona (metallurgy).
  • Dr. Abyl Sydykov of M3 Engineering & Technology Corporation, Tucson, Arizona (mineral recovery)
  • Mr. R. Douglas Bartlett, of Clear Creek and Associates of Phoenix, Arizona (hydrology, mining method, permitting and environment).
Each of these Qualified Persons has reviewed and approved the technical information contained in this news release that is relevant to their area of responsibility and verified the data underlying such technical information.