Mine production schedule

Year Mined Tons mtons Head Grade Recovered Copper
Total  Moved Mined Material Alluvium Waste Hardrock Waste % TCu ktons mlbs
-2 95.0   95.0        
-1 95.0 1.5 93.4 0.1 0.37 3.46 6.9
1 95.0 22.9 71.2 0.9 0.50 74.66 149.3
2 100.0 31.1 54.0 14.9 0.41 83.30 166.6
3 100.0 23.9 73.1 3.0 0.52 87.17 174.3
4 100.0 30.1 63.5 6.5 0.43 87.51 175.0
5 100.0 31.0 60.9 8.1 0.38 87.49 175.0
6 105.0 37.7 32.1 35.1 0.34 87.63 175.3
7 120.0 33.7 77.5 8.7 0.37 87.25 174.5
8 120.0 39.6 28.0 52.4 0.31 87.28 174.6
9 120.0 33.8 65.3 20.8 0.37 87.23 174.5
10 120.0 36.7 41.1 42.1 0.34 86.91 173.8
11 120.0 41.0 4.1 74.9 0.30 84.48 169.0
12 120.0 41.6   78.4 0.26 73.91 147.8
13 62.2 40.4   21.8 0.33 85.86 171.7
14 42.0 38.7   3.3 0.33 86.11 172.2
15 36.2 35.0   1.2 0.35 85.06 170.1
16 34.8 31.9   2.9 0.29 65.96 131.9
17           11.36 22.7
18           3.23 6.5

3D View of Gunnison Project Infrastructure

gunnison-copper-06-nov-2024-3

 

20160425_1105571.jpg

Gunnison
Copper
Project

Johnson Camp Mine

Johson
Camp Mine

20160425_120624.jpg

Corporate
Presentation

 
 

20180423_112314.jpg

Technical
Reports