• TSX: GCU

    Market Price: (CAD) $0.18
  • OTC: GCUMF

    Data not available

hIGHLIGHTS

  • Strong and Harris copper-zinc-silver deposit located just 1.3 miles (2.4km) north of Gunnison Copper’s Johnson Camp SX-EW facility.
  • Traditional open pit with high-grade underground mining of the remaining sulfides at the bottom of the pit.
  • Preliminary Economic Assessment (“PEA”) has been completed by Mine Development Associates,

The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

20160425_1105571.jpg

Gunnison
Copper
Project

Johnson Camp Mine

Johson
Camp Mine

20160425_120624.jpg

Corporate
Presentation

 
 

20180423_112314.jpg

Technical
Reports