pea 2021: cOMBINED PITS @ us$3.50/LB CU

Mine Life: ~7 years
Material Mined:  ~54 M ton
Cu/Zn Grades: 0.56% / 0.68%
Cu/Zn Produced:  437 M lb / 575 M lb
Initial Capital  $328 million
Operating Costs ($/lb CuEq)   $1.76
Average Cu/Zn annual production  62 Mlbpa / 82 Mlbpa
Pre-Tax NPV/IRR (8% discount rate)  $325M / 25%

20160425_1105571.jpg

Gunnison
Copper
Project

Johnson Camp Mine

Johson
Camp Mine

20160425_120624.jpg

Corporate
Presentation

 
 

20180423_112314.jpg

Technical
Reports